top of page
TIME PROBLEM 5
BRIEF
The developer from time problem 2 was unhappy with the scheme submitted by you. Reattempt time problem 2 with updated requirements of calculations, time sheets, design intention etc.
DELIVERABLES
Site plan [ground floor]
All level floor plans
All unit plans
Carpet, built up and super-built up area calculations
Progress documentation at 60 minute intervals
DURATION
24 hours
SITE
bottom of page