TIME PROBLEM 5

BRIEF

The developer from time problem 2 was unhappy with the scheme submitted by you. Reattempt time problem 2 with updated requirements of calculations, time sheets, design intention etc.

DELIVERABLES 

Site plan [ground floor]
All level floor plans
All unit plans
Carpet, built up and super-built up area calculations
Progress documentation at 60 minute intervals

DURATION 
24 hours

Site_TP2 copy.jpg

SITE